6.3 Disturbing Lead containing materials.

All work that results in the disturbance of lead containing materials must be performed in accordance with the “Procedural Flow Chart for Disturbing Lead” found in Appendix A. There are seven sets of procedures to select from, based on the results of the exposure assessment and the nature of the work.

Educational information on exposure levels produced during common operations and tasks is found in Appendix B.